And those with overgrown roots that can buckle or damage new sidewalk and curbs will also be removed. In order to accommodate new 75-foot utility poles, the installation of which began more than a year ago, many trees will be removed because their canopies conflict with the wires. This program is intended to provide a reliable source of power particularly during severe weather events,” township spokeswoman Natalie Pineiro said in an email on Jan. “Superstorm Sandy in 2012 devastated the town with extended power outages for weeks in some sectors. These upgrades are intended to add resiliency and redundancy to the electrical grid to reduce the frequency of outages in the township. PSE&G has proposed routes for connecting the three electrical substations in the township using aboveground and buried 69 kilovolt power lines the initial phase involves connecting the substations on Stanley Terrace and Springfield Road. UNION, NJ - Township residents will soon see a significant number of trees removed from along sidewalks and roads under PSE&G’s electrical upgrade program and the municipality’s 2019 road program. An aerial map shows the location of trees that are to be removed on Winslow Avenue as part of PSE&G’s electrical upgrade program and Union’s planned road work.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |